One-step solar back membrane-Innovation Award

Time: 2016-02-14

Changed the previous mode of production,Shorten and simplify the production process,the base and laminated film one step. And it saves space, is environmental protection, high efficient, low cost.

Previous:HIPS the max. capacity: 1700kg/hr [delivered to the customer at the end of 2015]